Investment Casting Metal Alloy Casting Factory for Mining Machinery
Overview Package size per unit product 10.00cm * 15.00cm * 10.00cm Gross weight per unit product 1.800kg Investment cast;
Basic Info
Model NO. | SE-120 |
Casting Form Usage Count | Permanent |
Surface Treatment | Electroplating |
Surface Roughness | Ra1.6 |
Coating | Syrup or pulp waste |
Machining Tolerance | +/-0.02mm |
Standard | ASTM |
Certification | ISO 9001:2008 |
Iron Type | Grey Iron and Ductile Iron |
Technical | CNC Maching |
Custom Design | Ok |
MOQ | 100PCS |
Lead Time | 30~35 Days |
Transport Package | Carton Box + Pallet |
Specification | ISO2000 |
Trademark | Seger |
Origin | Shandong, China |
HS Code | 8401309000 |
Production Capacity | 50, 000 PCS Per Month |
Packaging & Delivery
Package size per unit product 10.00cm * 15.00cm * 10.00cm Gross weight per unit product 1.800kgProduct Description
Investment casting metal alloy casting factory for mining machineryWhat We Do?Company Profile Detailed PhotosAt Seger industrial, we produce a huge range of products and are continually expanding our services to customers. This area shows images of some of our recent work to show the scope available to our clients. This is just a sample of what we can do, so please contact us for more information.
Material | Grey iron,ductile iron etc. |
Standard | DIN, ASTM, BS, JIS etc. |
Process | sand casting,resin bonded casting, investment casting(lost wax casting), die casting, pressing & forging. |
Weight range | 0.5-500kg |
Surface treatment | painting, polishing, heat treatment, plaining or galvanization etc. |
Machining | complete machining such as Machining center, CNC, Lathe, Milling machine,drilling etc. |
Size and design | As per the customer's drawings and requirements |
As per the customer's samples | |
Packing | Seger normal export packaging |
As per customers' requirements | |
Inspection | Foundry in-house |
Third Party inspection available upon customers requirements |
We can supply products with the following test reports:
1) Chemical composition report2) Tensile strength report
3) Brinell hardness report
4) Metallographic structure report
5) Key dimension checking report
6) Full dimension report
7) Third part test report
We will design each speical checking tooling control key dimension during production to ensure each key dimension under control.
Clients PraiseOur Service FAQ
Q1: What's the lead time?
A1: In general, the lead time is about 30~40 days for opening new moulds and mass production.
A2: The company ca accept a range of formats for drawings, but the main ones are detailed below: 2-D PDF AND TIFF 3-D STL, IGES, STEP, Solidworks, etc
Q3: Is it possible to visit seger to view it's manufacturing process?
A3: We are extremely proud of our facility and existing customers to visit our company. We think you will be impressed by us, as well as the warm welcome from our friendly, experienced team.
For more details,pls feel free to contact us.
You may also like
Send inquiry
Send now